
Wholesale Packaging & Filling Machines Manufacturer
Need a steady supply of Packaging & Filling Machines? We plan production around your forecast, keep quality consistent from batch to batch and keep you informed on every order. Contact CXB TOOLS to set up a long-term supply plan that fits your business.
- Min. Order1 Sets
- Price Range$4,800– to $5,850Reference price per Set
- SamplesAvailableRequest a sample
- Models1Browse all products
Price: $4,800-5,850
MOQ: 1 Sets
- Semi-automatic electric drive with 100 BPH capacity and 0.1–100 g filling range at ±0.5–1.5% accuracy speeds up small-batch sauce, honey, and powder runs.
- 70 L/min pump and food-grade stainless steel contact parts support food, cosmetic, and tobacco filling.
- Compact 1500×1500×1900 mm, 500 kg frame at 220 V/1.6 kW fits most production floors; online after-sales support and 1-year warranty.
Packaging & Filling Machines Buying Guide
Our Packaging & Filling Machines range includes 1 models. The minimum order quantity starts from 1 Sets. Reference prices range from $4,800 to $5,850. You can request a sample of 1 model to check quality first.
Packaging & Filling Machines Lead Time by Quantity & Destination
| Destination | Sea Freight (FCL) | Sea Freight (LCL) | Air Freight | Express (DHL / FedEx) |
|---|---|---|---|---|
| United States | 25–42 days | 32–47 days | 12–15 days | 10–13 days |
| Germany | 37–47 days | 42–52 days | 12–15 days | 10–13 days |
| Japan | 12–17 days | 15–21 days | 9–11 days | 9–11 days |
| United Kingdom | 37–47 days | 42–52 days | 12–15 days | 10–13 days |
| India | 19–27 days | 25–35 days | 10–13 days | 9–12 days |
| France | 37–47 days | 42–52 days | 12–15 days | 10–13 days |
| Italy | 35–45 days | 39–49 days | 12–15 days | 10–13 days |
| Russia | 32–52 days | 37–57 days | 13–17 days | 12–17 days |
| Brazil | 42–52 days | 47–62 days | 14–19 days | 12–16 days |
| Canada | 27–42 days | 35–47 days | 12–16 days | 10–14 days |
| Australia | 22–32 days | 27–37 days | 11–14 days | 10–13 days |
| Mexico | 32–42 days | 37–47 days | 13–17 days | 11–14 days |
| Spain | 35–45 days | 39–49 days | 12–15 days | 10–13 days |
| South Korea | 10–14 days | 12–17 days | 9–11 days | 9–11 days |
| Türkiye | 32–42 days | 37–47 days | 12–15 days | 10–13 days |
| Indonesia | 15–22 days | 19–27 days | 10–13 days | 10–12 days |
| Netherlands | 35–45 days | 39–49 days | 12–15 days | 10–13 days |
| Saudi Arabia | 25–35 days | 29–39 days | 11–14 days | 10–13 days |
| Switzerland | 39–49 days | 45–55 days | 12–15 days | 10–13 days |
| No matching destination. Contact us for your country. | ||||
| Destination | Sea Freight (FCL) | Sea Freight (LCL) | Air Freight | Express (DHL / FedEx) |
|---|---|---|---|---|
| United States | 30–47 days | 37–52 days | 17–20 days | 15–18 days |
| Germany | 42–52 days | 47–57 days | 17–20 days | 15–18 days |
| Japan | 17–22 days | 20–26 days | 14–16 days | 14–16 days |
| United Kingdom | 42–52 days | 47–57 days | 17–20 days | 15–18 days |
| India | 24–32 days | 30–40 days | 15–18 days | 14–17 days |
| France | 42–52 days | 47–57 days | 17–20 days | 15–18 days |
| Italy | 40–50 days | 44–54 days | 17–20 days | 15–18 days |
| Russia | 37–57 days | 42–62 days | 18–22 days | 17–22 days |
| Brazil | 47–57 days | 52–67 days | 19–24 days | 17–21 days |
| Canada | 32–47 days | 40–52 days | 17–21 days | 15–19 days |
| Australia | 27–37 days | 32–42 days | 16–19 days | 15–18 days |
| Mexico | 37–47 days | 42–52 days | 18–22 days | 16–19 days |
| Spain | 40–50 days | 44–54 days | 17–20 days | 15–18 days |
| South Korea | 15–19 days | 17–22 days | 14–16 days | 14–16 days |
| Türkiye | 37–47 days | 42–52 days | 17–20 days | 15–18 days |
| Indonesia | 20–27 days | 24–32 days | 15–18 days | 15–17 days |
| Netherlands | 40–50 days | 44–54 days | 17–20 days | 15–18 days |
| Saudi Arabia | 30–40 days | 34–44 days | 16–19 days | 15–18 days |
| Switzerland | 44–54 days | 50–60 days | 17–20 days | 15–18 days |
| No matching destination. Contact us for your country. | ||||
| Destination | Sea Freight (FCL) | Sea Freight (LCL) | Air Freight | Express (DHL / FedEx) |
|---|---|---|---|---|
| United States | 38–55 days | 45–60 days | 25–28 days | 23–26 days |
| Germany | 50–60 days | 55–65 days | 25–28 days | 23–26 days |
| Japan | 25–30 days | 28–34 days | 22–24 days | 22–24 days |
| United Kingdom | 50–60 days | 55–65 days | 25–28 days | 23–26 days |
| India | 32–40 days | 38–48 days | 23–26 days | 22–25 days |
| France | 50–60 days | 55–65 days | 25–28 days | 23–26 days |
| Italy | 48–58 days | 52–62 days | 25–28 days | 23–26 days |
| Russia | 45–65 days | 50–70 days | 26–30 days | 25–30 days |
| Brazil | 55–65 days | 60–75 days | 27–32 days | 25–29 days |
| Canada | 40–55 days | 48–60 days | 25–29 days | 23–27 days |
| Australia | 35–45 days | 40–50 days | 24–27 days | 23–26 days |
| Mexico | 45–55 days | 50–60 days | 26–30 days | 24–27 days |
| Spain | 48–58 days | 52–62 days | 25–28 days | 23–26 days |
| South Korea | 23–27 days | 25–30 days | 22–24 days | 22–24 days |
| Türkiye | 45–55 days | 50–60 days | 25–28 days | 23–26 days |
| Indonesia | 28–35 days | 32–40 days | 23–26 days | 23–25 days |
| Netherlands | 48–58 days | 52–62 days | 25–28 days | 23–26 days |
| Saudi Arabia | 38–48 days | 42–52 days | 24–27 days | 23–26 days |
| Switzerland | 52–62 days | 58–68 days | 25–28 days | 23–26 days |
| No matching destination. Contact us for your country. | ||||
Total = production (working days) + shipping (calendar days, port to port for sea freight, door to door for air and express). Estimates for reference only; we confirm the exact date with your quotation.
Get an Exact Lead TimeFree PDF Catalog 2026
Download the Other Tools Catalog
Every Other Tools product with photos, specifications and MOQ, plus a clickable product menu — easy to share with your team. Includes the Packaging & Filling Machines section of the Other Tools catalog.
- 3 products
- 5 pages
- PDF · 138.4 KB
- Updated September 30, 2026
Packaging & Filling Machines FAQs
What is the minimum order quantity (MOQ) for Packaging & Filling Machines?
The MOQ for our Packaging & Filling Machines starts from 1 sets.
Can I get a sample before placing a bulk order?
Yes. Samples are available for 1 of our Packaging & Filling Machines models. You can request a sample online and we will confirm the details with you.
Still have questions?
Get Samples of Our Packaging & Filling Machines
Check the materials, finish and workmanship before you order. Send us your requirements and we will arrange samples for your evaluation.
